Project:
Xanthe Resort Hotel Excavation, Backfilling, and Transmission Line
Business Address:
Kumköy / Side / Antalya
Employer:
Demirci Turistik Tesisleri A.Ş.
Date:
18.04.2005 - 13.09.2005
Project Cost:
358.000 USD